Civil and Hydro-mechanical Works of Upper Modi Hydroelectric Project under EPC Contract- Lot 1 Contract No: UMHEP/NCB-081/82/EPC-1 | Hydro-power | Ongoing | - | Ghandruk | under EPC Contract- Lot 1 Contract No: UMHEP/NCB-081/82/EPC-1 | View → |
|
Constructionof Dunduwa Branch Canal | Irrigation Project | Ongoing | - | Bunduwa | (Ch 6+975 to 23+400) and their associated structures | View → |
|
Construction of Dunduwa Branch Canal (CH 1+429 to 6+975), | Irrigation Project | Ongoing | - | Khajura | Sikta Link Canal of WMC, Khajura and Manpur Sub-branch and their associated structures | View → |
|
Civil Lot -I Works (Headworks, Tunnel, Inlet Portal, HRT 1500m) | Hydro-power | Ongoing | - | Marshyandi | Of Marshyangdi Besi Hydroelectric Project (50MW) | View → |
|
Construction of all Underground and Surface Civil works from HT CH: 2+230 | Hydro-power | Ongoing | - | Myagdi | Construction of all Underground and Surface Civil works from HT CH: 2+230 to Powerhouse including Infrastructure Development Works | View → |
|
Command Area Protection Work | River Training | Ongoing | - | Rapti | Command Area Protection Work using Innovative River Technology (Fabric Form Concrete) at Left Bank of Rapti River | View → |
|
Bagmati Small Hydropower Project | Hydro-power | Ongoing | - | Bagmati | Mandu Hydropower Ltd | View → |
|
Construction of Headworks and Associated Structures of Upper Rahughat Hydroelectric Project (48.5MW) | Hydro-power | Completed | 2025 | Rahughat | Weir and Stilling Basin, Undersluice, Intake, Approach Canal | View → |
|
Construction of Mewa Khola Hydroelectric Project (50MW) | Hydro-power | Completed | 2025 | Mewa Khola | United Mewa Khola Hydropower Pvt Ltd | View → |
|
Construction of Raughat Mangale Hydropower Project (35.5MW) | Hydro-power | Completed | 2025 | Raughat | Weir and Stilling Basin, Undersluice, Intake, Approach Canal, Settling Basin, Headpond, Spillway, Headrace Pipe Allignment, Headrace Tunnel, Adit Tunnel, Valve House, Penstock Alignment, Powerhouse, Tailrace and Switchyard | View → |
|
Command Area Development Works of Rani, Jamara and Kuleriya Irrigation Systems, Lot -2 Jamara Irrigation System | Irrigation Project | Completed | 2024 | Kuleriya | RCC Canal Lining, RCC Canl, River training Works and water regulating gate | View → |
|
Construction of Rigid Payement, Structural and Drainage Works at Ch 9+000 to 10+040 along Mirchaiya Katari Ghurmi Road, | Road Construction | Completed | 2024 | Udaypur | Concrete works for rigid road pavement | View → |
|
Construction of Embankment Using Innovative River Technology | River Training | Completed | 2024 | Tinau | Concrte Foam Mattress, M25 Concrete, Embankment Construction | View → |
|
Construction of Narayasthan Pul-Bhalamakhola-Chandipatan-Deurali-Armala Road | Road Construction | Completed | 2024 | Deurali | Construction of Narayasthan Pul-Bhalamakhola-Chandipatan-Deurali-Armala Road Contract No: IDOKASKI/W/R/28/075-76 Substantially Completed | View → |
|
Civil Construction of Daram Khola Hydroelectric Project (9.6 MW) Contract No: DKHEL-CW-2074-001 | Hydro-power | Completed | 2023 | Baglung | Contruction of Headworks, Headrace Pipe Alignment, Surge Tank, Powerhouse and Tailrace | View → |
|
Roadway Excavation, Retaining Structures Drainage and Pavement Works | Road Construction | Completed | 2023 | Gulmi | Roadway excavation, Stone Soiling, Gabion Works, GeoTextile, Random Rubble Masonry, Sub base, PCC Works, Hume Pipe laying | View → |
|
Extension of Irrigation Canal Of Jhajh Irrigation Scheme, Rautahat District Bagmati Irrigation Project | Irrigation Project | Completed | 2022 | Rautahat | Construction of Weir, Intake, Canal Embankment, Canal Lining, Village Road Bridge, Foot Bridge, Division Box, Hume Pipe Outlet and Tail Escape | View → |
|
Track Opening Work of Access Road for Upper Khudi Hydroelectric Project, Lamjung, Nepal | Road Construction | Completed | 2022 | Lamjung | Roadway excavation | View → |
|
Construction of Diversion Structures | Water Supply | Completed | 2021 | Jhumsa Khola | Construction of Diversion Structures (Weir, Intake & Connecting Pipes) | View → |
|
Construction of Solududhkunda Salleri-5, Selgudi Dada-Mapya Dudhkoshi 5 Kanhu Mahabir Hudai Thuldhunga Andheri Khumbu Pasanglamu Road | Road Construction | Completed | 2021 | Okhaldhunga | Roadway excavation, Stone Soiling, Gabion Works, GeoTextile, Random Rubble Masonry, Sub base, PCC Works, Hume Pipe laying | View → |
|
Road Upgrading Work of Mudhe-Melung Road (Sittali-Melung Sector) | Road Construction | Completed | 2020 | Sittali | Roadway Excavation, Gabion Works. Masonry Wall, Culvert, Drain and Causeway, Surface Improvement Work, and Traffic Safety | View → |
|
Construction of MBM Building at Shanker Dev College | Building | Completed | 2020 | Kathmandu | Construction of three floor truss building truss roofing with area of: | View → |
|
Roadway Structure, Drain Maintenance, Causeway and Pavement Construction Works in Manthali Khurkot Road | Road Construction | Completed | 2020 | Charikot | Roadway Structure, Drain Maintenance, Causeway and Pavement Construction Works | View → |
|
Civil Construction Work of Singati Khola Hydroelectric Project | Hydro-power | Completed | 2020 | Singati | River Training Structures ( Weir, Undersluice, Intake, Gravel Trap, Approach Canal, Desanding Basin, Protection Works), Anchor Block, Saddle Support, Powerhouse | View → |
|
Raatadanda-Musikot-Paudi-Amrai-Neta-Darling-Hwangdi Road, Gulmi, Section (Ch. 0+000-6+500) | Road Construction | Completed | 2020 | Gulmi | Roadway excavation, Stone Soiling, Gabion Works, GeoTextile, Random Rubble Masonry, Sub base, PCC Works, Hume Pipe laying | View → |
|
Reconstruction and Rehabilitation of Haldibesi - Dhobi-Dhandebrshi Road, | Road Construction | Completed | 2019 | Dhobi | Earthquake Emergency Assistance Project Jwagal, Lalitpur, Nepal) | View → |
|
Upgrading of Tansen Ridi Bypass Road | Road Construction | Completed | 2019 | Tansen, Palpa | Holangdi-Dhungakhani Section | View → |
|
Reconstruction and Rehabilitation of Devitar-Doramba-Paseban-Kolibagar Road,Devitar-Phulasipokhari Section from (Km0+000 to Km 16+140.4), | Road Construction | Completed | 2019 | Devitar | Earth Works in Excavation, Gabion Structures, Stone Masonary Works, Filling and Bakfilling , Geotextile,M10 M20 M25 Concrete, Forma work, Reinforcement, Humepipe Laying, Preparation of Subgrade, Capping layer,Bio- Engineering works | View → |
|
Simaltari-Dwaneta-Purkotdaha Road Project. | Road Construction | Completed | 2019 | Simaltari | Roadway excavation, Stone Soiling, Gabion Works, GeoTextile, Random Rubble Masonry, Sub base, PCC Works, Hume Pipe laying | View → |
|
Khimti Pharpu Namadi Betali Those Garjyang Deurali Gumdel Road. | Road Construction | Completed | 2019 | Deurali | Roadway excavation (Hard Rock),Dry Stone Soling, PCC(M15/M40),Plump Concrete,Gabion Works, GeoTextile, Random Rubble Masonry, Sub base | View → |
|
Upgrading Of Chhalditari Ismamaidan Road | Road Construction | Completed | 2019 | Gulmi | Roadway excavation, Stone Soiling, Gabion Works, GeoTextile, Random Rubble Masonry, Sub base, PCC Works, Hume Pipe laying | View → |
|
Bheduwa Hunga Sinse Shantipur Road Project | Road Construction | Completed | 2018 | Gulmi | Bheduwa Hunga Sinse Shantipur Road Project Contract No: TSPRP-3371234-2071/72-065 | View → |
|
Upgrading and Improvement of Roads, Rakse-Amari-Kalyara-Phulbari Road | Road Construction | Completed | 2018 | Gulmi | Upgrading and Improvement of Roads, Rakse-Amari-Kalyara-Phulbari Road (Ch 0+000 to 4+500), Gulmi Contract No: TSPRP/3371234/072/73-049 | View → |
|
Niglihawa Belawa irrigation Project | Irrigation Project | Completed | 2018 | Kapilvastu | Niglihawa Belawa irrigation Project Contract No: MIP/DOI/NCB/Niglihawa-2a/Kapilvastu/072/073 | View → |
|
Civil Construction Works of Sabha Khola Hydropower Project, | Hydro-power | Completed | 2018 | Sabha Khola | Headworks/Intake, Approach Canal, Spillway, Settling Basin, Headrace Canal, Penstock Alignment, Anchor Block, Forebay, Saddle Support, Power House and Switchyard, Tailrace Canal, Access Road, Earthworks, Gabion Works,Stone masonary. | View → |
|
Upgrading of Charkhot-Shantipur Road | Road Construction | Completed | 2018 | Charkot | Roadway excavation, Stone Soiling, Gabion Works, GeoTextile, Random Rubble Masonry, Sub base, PCC Works, Hume Pipe laying | View → |
|
Upgrading of Sewa-Simghat Road | Road Construction | Completed | 2018 | Gulmi | Roadway excavation, Stone Soiling, Gabion Works, GeoTextile, Random Rubble Masonry, Sub base, PCC Works, Hume Pipe laying | View → |
|
Baletaksar Tahatim Ullikhola Road, Ranibas Chautara Baletaksar Ring Road and Bhatkuwa Satmure Maulipur Hardineta Road | Road Construction | Completed | 2017 | Gulmi | Roadway excavation, Stone Soiling, Gabion Works, GeoTextile, Random Rubble Masonry, Sub base, PCC Works, Hume Pipe laying | View → |
|
Sardi Khola Hydropower Project, Mandakini Hydropower Ltd | Hydro-power | Completed | 2017 | Mandakini | Civil Works (Weir& Intakt, Desanding basin, Anchor and Saddle Suports, Low/High Pressure Penstock Pipe, Surge Tank, Powerhouse, Tailrace, Switchyard & Protectioin and Bioengineering Works | View → |
|
Ginger Washing and Processing Facilities | Building | Completed | 2015 | Jhapa | Ginger Washing and Processing Facilities, Duwagadhi-9, Jhapa Contract No: FANEP/2014-2 | View → |
|
Construction of 3 span Rcc Bridge (18.7m each Span) over Badighatkhola in Kharwang paudi Neta Hawangdi arkhabang | Bridge | Completed | 2015 | Gulmi | Construction of Bridge | View → |
|
Civil Construction Works of Jiri Small Hydropower Project | Hydro-power | Completed | 2015 | Jiri | Headworks/Intake, Approach Canal, Spillway, Settling Basin, Penstock Alignment, Anchor Block, Surge Tank, Saddle Support, Power House | View → |
|
Additional Protection Works of Ankhu Khola Hydroelectric Project | Hydro-power | Completed | 2014 | Ankhu | Earthworks in Excavation, Gabion Works, Headworks Maintenance Works | View → |
|
Construction of Plate Girder Bridge over Daram Khola along Wamitaksar (Gulmi)-Kharbang (Baglung) Road | Bridge | Completed | 2014 | Gulmi | Open Foundation type, Plate Girder Bridge, Single Span of 36m | View → |
|
Civil Construction Work of Ankhu Khola Hydroelectric Project | Hydro-power | Completed | 2013 | Ankhu Khola | Headworks/Intake, Approach Canal, Spillway, Settling Basin, Penstock Alignment, | View → |
|
Construction of Access Road Section Between Haldebeshi to Dhobi (Km 0+000 to Km 20+000), | Road Construction | Completed | 2012 | Haldebeshi | Construction of Access Road Section Between Haldebeshi to Dhobi (Km 0+000 to Km 20+000), Likhu IV Hydroelectric Project, Green Ventures Pvt. Ltd., Kathmandu | View → |
|
Construction of Access Road Section Between Haldebeshi to Dhobi | Road Construction | Completed | 2012 | Haldebeshi | Construction of Access Road Section Between Haldebeshi to Dhobi (Km 0+000 to Km 20+000), Likhu IV Hydroelectric Project, Green Ventures Pvt. Ltd., Kathmandu | View → |
|
Chameliya Hydroelectric Project | Hydro-power | Completed | 2011 | Darchula | Chameliya Hydroelectric Project, Contract No: 062/63-B4, Nepal Electricity Authority | View → |
|
Upgrading of Access Road Section Between haldebesi to Dhobi | Road Construction | Completed | 2009 | Haldebeshi | Upgrading of Access Road Section Between haldebesi to Dhobi (Km 0+000 to Km 20+000), Likhu IV Hydroelectric Project, Green Ventures Pvt. Ltd., Kathmandu Contract No: GVN/LIV/INFRA/HDR/2009/01 | View → |
|
Upgrading of Access Road Section Between haldebesi to Dhobi (Km 0+000 to Km 20+000), | Road Construction | Completed | 2009 | Haldebeshi | Upgrading of Access Road Section Between haldebesi to Dhobi (Km 0+000 to Km 20+000), Likhu IV Hydroelectric Project, Contract No: GVN/LIV/INFRA/HDR/04/2008, Green Ventures Pvt. Ltd., Kathmandu | View → |
|
Road Construction Works (DRILP/RCH/MPR/WORKS/NCB/01), | Road Construction | Completed | 2009 | Rammechhap | Road Construction Works (DRILP/RCH/MPR/WORKS/NCB/01), District Development Office, Ramechhap | View → |
|
Road Construction Works, Chameliya Hydroelectric Project , Nepal Electricity Authority | Road Construction | Completed | 2007 | Darchula | Road Construction Works, Chameliya Hydroelectric Project , Nepal Electricity Authority | View → |
|
Pheme Khola Small Hydropower Project, | Hydro-power | Completed | 2007 | Khorang | Pheme Khola Small Hydropower Project, Contract No: PKSHP/CW-01/062/063, 1MW, Khoronga Hydropoer Pvt. Ltd. | View → |
|
Bagmati Irrigation Project | Irrigation Project | Completed | 2001 | Kathmandu | Bagmati Irrigation Project,Contract No: CAD WP-41, Department of Irrigation | View → |
|
Bagmati Irrigation Project | Irrigation Project | Completed | 2000 | Katmandu | Bagmati Irrigation Project, Contract No: JD/CAD/WP-17 (J1), Department of Irrigation | View → |
|
Upgrading of Gravel section to Sealed Standard of Chisapani-Birendranagar Road | Road Construction | Completed | 1999 | Chisapani | Upgrading of Gravel section to Sealed Standard of Chisapani-Birendranagar Road (Part-II) (Km 46+425 to Km 90+317), Contract No: RMRP/PM/ICB-4, Department of Road | View → |
|
Bagmati Irrigation Project | Irrigation Project | Completed | 1998 | Bagmati | Bagmati Irrigation Project,Contract No: BH/CAD/WP-11, Department of Irrigation | View → |
|
Sudama Barrage | Irrigation Project | Completed | 1997 | Sudama | Sudama Barrage, Department of Irrigation | View → |