← Back to Projects
Reconstruction and Rehabilitation of Devitar-Doramba-Paseban-Kolibagar Road,Devitar-Phulasipokhari Section from (Km0+000 to Km 16+140.4),
Completed
•
Devitar
Overview
Earth Works in Excavation, Gabion Structures, Stone Masonary Works, Filling and Bakfilling , Geotextile,M10 M20 M25 Concrete, Forma work, Reinforcement, Humepipe Laying, Preparation of Subgrade, Capping layer,Bio- Engineering works
Key Details
- Category: Road Construction
- Date: 2019
- Location: Devitar
- Status: Completed